KNOW SOME OF OUR PROJECTS
SUPERVISION OF THE CONSTRUCTION PROJECT OF THE JUAN PABLO II TUNNEL
Project to improve the flow of vehicle traffic in the capital city, works in an east-west direction and vice versa, at the bottom, the tunnel will house four lanes with a length of 262.77 meters from the beginning of the ramp to the end of the same, and a width of 15.00 meters distributed in four lanes of 3.50 meters, 2 in each direction.
SUPERVISION OF THE SAN ALEJO HYDROLECTRIC CENTRAL CONSTRUCTION PROJECT
The work, typical of a water edge, captures part of the river flow and uses the natural topographic slope for the generation of electrical energy. It will have an installed power of about 2,117 Kilowatts and must generate an annual average of about 9,260 Megawatts-hour